Company

Infrastructure should evolve as fast as energy.

Europe is electrifying, generation is decentralising, mobility is changing and car parks are becoming productive infrastructure. The physical systems behind this transition remain too slow and too bespoke. SUUN exists to industrialise them.

Mission

Develop solar stations that power electric mobility, produce local energy and support tomorrow’s grids.

Vision

Turn car parks, infrastructure and urban spaces into energy assets to accelerate Europe’s transition.

Method

Design once with bridge-grade rigour, then deploy many times.

Ambition

A European product from day one, crossing borders with local partners.

SUUN canopy on an urban square

Team

Built by entrepreneurs, engineered by structural experts.

The founding team already built and grew Auum together, alongside structural engineers and concrete manufacturers.

Portrait of Clément Houllier
Clément HoullierCofounder & CEOFormer CEO and cofounder of Auum. ISAE engineer, formerly at L’Oréal.
Portrait of Nina Velly
Nina VellyCofounder & CFOFormer CFO of Auum. ESSCA, formerly M&A at BDO.
Portrait of Sébastien Pascal
Sébastien PascalCofounder, technical advisorFormer VP Product of Auum. Centrale Lyon, formerly at Safran.
Portrait of Raphaël Fabbri
Raphaël FabbriHead of structural engineeringCofounder and managing director of Atelier Masse; lecturer in architecture and structural design.
Portrait of Laurent Fehr
Laurent FehrInvestor & advisorDevelopment Director, Groupe FEHR.

Industrial partner

Industrialised with Groupe FEHR.

A precast concrete and UHPFRC specialist, Groupe FEHR hosts our first four projects on its sites and brings its industrial production capacity to SUUN.

Visit Groupe FEHR
1960Family business founded in
~785Employees
5Production sites, 2 in Germany
ISO9001 · 14001 · 45001

Figures published by Groupe FEHR.

Ecosystem

Engineered with a strong ecosystem.

See partners

SUUN SAS · share capital €5,000 · RCS Paris 104 140 694 · 5 rue de Stockholm, 75008 Paris

Let’s build the next 30 metres.

Tell us about your site, your portfolio or your project. Our engineering team replies within two working days.

Assess my siteSimulator