Technology

Innovation, stated plainly.

A proprietary structural system, a civil-engineering material and industrial engineering to transform solar infrastructure. Each building block shows its maturity.

ARKLOCK

Deployable, lockable structural system for 30 m spans. Patent applications filed with INPI (France) in October 2026.

Designed, prototype in preparation

UHPFRC

Ultra-high-performance fibre-reinforced concrete for slender, durable, highly loaded members.

Proven material

Modular engineering

Standard 30 m module, configured per site and checked to the Eurocodes.

Designed and verified

Industrialisation

Prefabrication and off-site pre-assembly with industrial partners; reference projects designed in France and Germany.

Under way

Energy integration

EV charging, batteries, lighting and sensors carried by the structure.

Integrating

SUUNCRETE

Research on functional UHPFRC able to store energy within the structure, with ESPCI Paris.

Research
SUUN visualisation: exploded 30 m module, V columns, truss and solar roofSUUN visualisation · illustration
Mood illustration. For exact geometry, see the axonometric and technical data on the System page. System page
V-shaped UHPFRC pillars of a SUUN canopySUUN visualisation

Material

Concrete, reconsidered.

UHPFRC is the material of bridges and footbridges: compressive strength above 130 MPa, very low porosity, long service life. It allows slender pillars carrying long spans, uncoated, even in aggressive environments.

UHPFRC guide

Structural principle

Compression and tension, each in its place.

Top chords: compressionTensioned bottom cable: tension30 mV-shaped UHPFRC pillars
SUUN structural principle: UHPFRC in compression, cable in tension

Let’s build together.

Industrial, materials or research partners: let’s talk about what we can build together.

Assess my siteSimulator