Free simulator · 2 minutes
What your car park could generate, and what doing nothing costs you.
APER obligation, installable power, savings, investment and a comparison of four financing models. Instant orders of magnitude, to be refined with our engineering team.
Cumulative cash flow over 20 years
Compare financing models
| Model | Upfront | Net flow year 1 | Net gain 20 yrs | Best for |
|---|
And with SUUN?Principle estimate
Fewer supports mean fewer foundations, fewer site risks and more free spaces. The actual number of supports depends on your parking layout.
Get your detailed study.
Precise yield, layout, costing and financing plan for your site.
French regulatory framework, checked on 29 September 2026 (have it confirmed by your adviser): article 40 of law no. 2023-175 (APER), decree no. 2024-1023, law of 26 November 2025 and decree no. 2026-842. Existing outdoor car parks above 1,500 m²: at least 50% of the area shaded, by 1 July 2026 above 10,000 m² and by 1 July 2028 between 1,500 and 10,000 m²; mixed solution allowed (at least 35% of that half in PV); exemptions and conditional extensions; fines up to €20,000 or €40,000 per year. Economic assumptions are indicative and editable; module degradation 0.4%/yr, 20-year horizon. This simulator does not replace a feasibility study or a quote.
Is the simulator result a quote?
No. It gives orders of magnitude based on indicative, editable assumptions. It replaces neither a feasibility study nor a quote.
Which assumptions are used?
Investment in €/Wp, capacity per covered m², electricity and surplus prices, operating costs, financing rate and term, module degradation of 0.4% a year, over a 20-year horizon. All can be edited.
Is my data stored?
No. The calculation runs in your browser; nothing is sent unless you fill in the contact form.
How do I get a precise study?
Use “Assess my site”: yield, layout, pricing and financing plan are drawn up from your car park plan (assess my site).