Asset owners
Turn your car park into energy infrastructure.
Your car parks already exist. SUUN makes them compliant and productive without losing spaces or closing the site.
Why SUUN
A car park that produces.
Fewer columns, more spaces
Long spans keep bays and aisles clear.
Energy on site
Generation where power is used: self-consumption or export.
Charging-ready
A structure designed to host chargers as fleets electrify.
APER compliance
Half of the area shaded for car parks above 1,500 m².
Short works
Pre-assembled modules and phased works on a site that stays open.
A durable, mobile asset
UHPFRC built to last, demountable structure if the site changes.
What if your land created value over 5 years, not 25?
The SUUN structure deploys and dismantles. A car park awaiting redevelopment, a site in transition or a short lease can finally generate energy.
APER law: are you concerned?Relocatable carports: how it worksGuides
Go further.

France’s APER law: the solar canopy obligation for car parks
French outdoor car parks above 1,500 m² must be 50% covered by solar canopies. Deadlines (1 July 2026 and 2028), penalties, exemptions and how to prepare.

Solar canopies for shopping centre car parks
Adding solar canopies to a retail car park: APER compliance in France, customer experience, spaces kept, EV charging, works without closing. The SUUN method.

Self-consumption on car parks: use what the canopy produces
Using the electricity from your solar carport on site: individual or collective self-consumption, sizing, surplus, storage and EV charging.
Will I lose parking spaces?
With fewer supports, fewer spaces are obstructed: every column avoided is a space kept and one foundation less. Your site layout plan quantifies it precisely.
Must the car park close during works?
No. Works are phased by zone; parts arrive pre-assembled and supports are few, which reduces the area closed at each stage.
Can I equip my car park without investing myself?
Yes, through third-party investment: a producer finances, builds and operates the carport in exchange for a right of occupancy. The simulator compares this with purchase, loan and leasing (third-party financing).
My land has another project in five years: does a carport make sense?
That is exactly the use case for a demountable structure: it generates power for the available period, then can be redeployed elsewhere, subject to study and contract (relocatable carport).
Asset owners
Assess your site
A short form to start. We prepare a first assessment of what your site can host.
Thank you, your request has been sent.
It has reached SUUN directly: we reply within two working days. A confirmation is on its way to your inbox.