Legal

Legal notice

Information about the publisher and host of suun-energy.com.

Publisher

SUUN, simplified joint-stock company (SAS) with share capital of €5,000
Registered office : 5 rue de Stockholm, 75008 Paris, France
RCS Paris 104 140 694 · EUID FR7501.104140694
Publication director : Clément Houllier, President
Contact : clement@suun-energy.com

Hosting

Wix.com Ltd., 40 Namal Tel Aviv St., Tel Aviv 6350671, Israel · www.wix.com

Intellectual property

All content on this site (text, images, diagrams, logos, SUUN brand) belongs to SUUN or its partners. Reproduction without written permission is prohibited. Images marked “SUUN visualisation” are architectural renderings, not photographs of completed installations.

Liability

Published information, including guides, is general and constitutes neither legal advice nor a design study. Engineering targets are presented as such.

Photo credits

“SUUN visualisation” images: SUUN. Illustration photos: Pexels (Kindel Media, Braeson Holland, Anonim Zero, Enes Beydilli, Pixabay, Michael Pointner, Clicker Babu, China Yu, Magic K, Josh Sorenson), under the Pexels licence.

External links

Links to partner websites are provided for information; SUUN is not responsible for their content.

Assess my siteSimulator