SUUN canopy on an urban square near a station

Concessions & mobility

From car park to energy hub.

Service areas, airports, stations and interchanges need infrastructure combining solar, charging and energy services over time.

Why SUUN

An infrastructure layer, not a one-off project.

Service areas

Long spans over cars and HGVs, structure ready for high-power charging.

Airports

Covering very large areas while keeping traffic lanes clear.

Stations and interchanges

Architectural canopies for urban spaces.

Reversible

A demountable, redeployable structure matched to the contract term.

Charging and storage

Charging, storage and energy management integration under development.

Durable

Uncoated UHPFRC designed for demanding environments.

FAQ

Your questions, answered.

Questions from concession holders and mobility operators.

All 48 FAQ answers
My concession lasts less than 15 years: is that compatible?

Yes. A demountable, relocatable structure can be matched to the contract term, then reinstalled elsewhere, subject to study (relocatable carport).

Can HGV bays be covered?

Yes. Clear height is configured to the vehicles; the Châteauneuf-sur-Isère project covers 70 HGV bays (logistics and HGVs).

Is high-power charging planned?

The structure is designed to carry charger routes and mounts; integration of charging, storage and control is under development (EV charging).

What happens to the carport at the end of the contract?

It depends on the contract: redeployment to another site, sale, extension or dismantling with reinstatement. These terms are set at design stage.

Concessions & mobility

Talk to SUUN

Tell us about your network and your timelines.

This field is required.
This field is required.
Enter a valid email address.
This field is required.
This field is required.
This field is required.
This field is required.
Reply within two working days.

Sent directly and securely, without opening your email app. Your data is only used to reply to you (privacy).

Thank you, your request has been sent.

It has reached SUUN directly: we reply within two working days. A confirmation is on its way to your inbox.

Assess my siteSimulator