Pre-assembled SUUN modules before lifting

Developers & EPCs

Build more. Build faster.

A standard structural product your teams price, engineer and deploy the same way on every project.

Why SUUN

Your pipeline. Our infrastructure.

One product, every project

A catalogue of configurations instead of a new frame per site. Reusable pricing and engineering.

Eurocode design, handled

Site-specific wind, snow and ground checks on a validated structural system.

Less time on site

Beams arrive pre-assembled: foundations, lifting and tensioning.

Fewer foundations

Long spans cut support points and the civil works that go with them.

Each project takes less effort

The second project takes less effort than the first; the tenth, less again.

One partner, several markets

France and Germany first, then Italy and Sweden, through your pipeline.

FAQ

Your questions, answered.

Questions from developers and EPCs before adopting Suun Light.

All 48 FAQ answers
What does SUUN supply on a project?

A standard structural product: UHPFRC pillars, pre-assembled ARKLOCK 30 m modules and site-specific engineering. The PV layer sits on rails compatible with market modules; work packages are agreed with your team.

Are checks carried out for each site?

Yes: wind, snow, ground, clearances and layout are checked for each project to the Eurocodes, on a structural system that is already designed (snow and wind).

How can we price a project quickly?

Send the car park plan and location: we come back with a first configuration. The Suun Light technical pack gives the design data (technical pack).

Which countries does SUUN work in?

France and Germany first, with a first project in Achern; then Italy and Sweden, through your pipeline and local partners (carports in Europe).

Developers & EPCs

Discuss a project

Share the essentials. We come back with a first configuration and the questions that matter for your site.

Get the Suun Light technical pack

This field is required.
This field is required.
Enter a valid email address.
This field is required.
This field is required.
This field is required.
This field is required.
This field is required.
This field is required.
Reply within two working days.

Sent directly and securely, without opening your email app. Your data is only used to reply to you (privacy).

Thank you, your request has been sent.

It has reached SUUN directly: we reply within two working days. A confirmation is on its way to your inbox.

Assess my siteSimulator