Snow and wind: how the Eurocodes size a solar carport

A carport is a large, light surface exposed to the weather. Wind and snow, far more than panel weight, size its structure and foundations.

Updated 27 September 20266 min readBy the SUUN engineering team
Structural model of a SUUN 30 m span

The framework: EN 1990 and EN 1991

The Eurocodes set the basis of design (EN 1990) and the actions to consider (EN 1991), including snow (EN 1991-1-3) and wind (EN 1991-1-4). Each country sets its values in a national annex: zone maps, altitude, terrain categories.

Wind: uplift first

An open canopy takes pressure and suction on both faces. Wind can press it down but above all lift it: that case often sizes foundations and anchors. Site, height, terrain roughness and nearby obstacles all enter the calculation.

Snow: loads and drifts

Snow load depends on zone and altitude and applies with shape coefficients. Drifts against an obstacle or unbalanced loads can govern over the uniform load. In Nordic or mountain climates they become decisive.

Under snow, loads and drifts drive the design.
Under snow, loads and drifts drive the design.
Top chords: compressionTensioned bottom cable: tension30 mV-shaped UHPFRC pillars
SUUN structural principle: UHPFRC in compression, cable in tension

At SUUN

The 30 m module is checked to the Eurocodes and each site’s national annex, with Atelier Masse. The Suun Light Nordic option strengthens the structure for heavy snow. Request the structural principles.

Frequently asked questions

Does one product work everywhere?

The module stays the same; its checks and, if needed, reinforcements change with the site’s loads.

Does a carport need clearing of snow?

A carport designed for the site’s snow load does not need clearing for stability; operators may do it for output or user safety.

General information, up to date at the date shown. Design and regulatory compliance of each project must be validated by the competent teams.

Let’s build the next 30 metres.

Tell us about your site, your portfolio or your project. Our engineering team replies within two working days.

Assess my siteSimulator