Project · Alsace, France

Bischwiller

Car park of a Groupe FEHR industrial site: first reference project for the SUUN 30 m system.

Existing Groupe FEHR site in Bischwiller, future SUUN siteExisting site, before works
478kWp (project study)
100Parking spaces
30 mSpan between supports
Q1 2027Planned deployment

Module count and covered area to be confirmed after final design.

Challenge

Cover an operating site

Solarise an industrial car park without disrupting activity and with few supports.

Solution

SUUN 30 m spans

V-shaped UHPFRC supports (Ø 220 mm columns) and pre-assembled lattice beams, designed with Atelier Masse.

Results

Published after commissioning

Output, works duration and carbon footprint will be measured on site.

Structural model of the 30 m span designed for BischwillerStructural model · Atelier Masse for SUUN